Full bathroom remodel
Coordinate the shower or tub, vanity, tile, fixtures and finishes as one room.
Decide first: Decide what stays, whether fixture locations change and which specialist work needs to be included.
Used in your estimate and project forms. Confirm availability with Numark.
Browse Home Depot’s Bath department. Purchases there are made directly with Home Depot.
Numark Services · Royal Oak, MI
Whether your Royal Oak bathroom needs a refresh or a full gut, Numark Services plans the work room by room and keeps plumbing, tile and finish trades on one schedule.
Numark Services offers bathroom remodeling for properties in Detroit and the listed Southeast Michigan service areas. Share your location to confirm project coverage and availability.
Phone answered 24/7 · Meetings by appointment · Response availability confirmed directly
Bathrooms run in a set sequence: protect the home, remove old finishes, correct hidden damage, rough-in, waterproof, tile, then fixtures. We explain each step so you know when the room will be usable again.
Royal Oak is known for 1920s–1950s bungalows and colonials near Woodward Avenue, where smaller footprints, older framing and tight lots affect layout and staging. In a bathroom, original pipes, subfloors and ventilation are checked before finishes are chosen. Royal Oak is a service area, not a branch office; crews travel from Detroit.
Tub-to-shower conversions, walk-in and low-threshold showers, new tile floors and walls, vanity and toilet replacement, lighting and exhaust fans, grab-bar backing and repairs to water damage found behind old finishes.
Many projects involving plumbing, electrical or structural changes require permits from Royal Oak's building department. We identify likely permit needs during the estimate.
No. Numark Services is based in Detroit, and Royal Oak is one of our service areas. Share the exact address so we can confirm availability.
Photos of the space, rough measurements, the address and any inspiration pictures or product choices. A free virtual estimate is available; written residential estimates are $250 and scheduled by appointment.
Share photos of your Royal Oak bathroom and the fixtures you want changed. A free virtual estimate is available; written residential estimates are $250 and scheduled by appointment.

Choose the work you actually need before comparing estimates. Each option below is a starting point for a written project scope.
Coordinate the shower or tub, vanity, tile, fixtures and finishes as one room.
Decide first: Decide what stays, whether fixture locations change and which specialist work needs to be included.
Focus the discussion on the bathing area, surrounding finishes and a possible tub-to-shower change.
Decide first: Review access, drainage, preparation and the boundaries between the new wet area and finishes that remain.
Refresh selected elements while retaining suitable parts of the existing bathroom.
Decide first: Identify retained surfaces and any repairs, plumbing connections or height changes the update affects.
Tile is the finish, not the entire water-management system. Ask the scope to identify the preparation, waterproofing, drain and transition details appropriate to the selected assembly. Known leaks or damaged materials need review before new finishes are installed; surface photos alone cannot establish concealed conditions.
Compare the vanity size, usable storage, mirror and fixture positions together. For a high-end bathroom, agree tile layout, edge profiles, hardware finishes and the details where materials meet. Record specific selections or clearly defined allowances so the estimate reflects the appearance you want.
Discuss door swing, circulation, bathing access and who will use the room. Share mobility priorities and whether the home has another usable bathroom. Accessible upgrades need project-specific dimensions and selected features; a product description alone does not establish that the complete room meets a particular standard.
Fixture changes can affect work behind walls as well as the visible room. Identify the responsible providers, required licensed trades, permit and inspection responsibilities and exhaust-ventilation scope in the project agreement. Keeping fixture locations does not automatically remove those coordination needs.
Bathroom remodeling cost follows the room, its condition and the agreed work. A selected finish update and a full layout change need different estimates. Compare the same inclusions, allowances and exclusions; Numark's estimate or consultation fees are separate from construction pricing.
| Estimate item | What to have written down |
|---|---|
| Included work | Rooms, surfaces, quantities, preparation and finish details. |
| Selections and allowances | Chosen products and amounts reserved for items still to be selected. |
| Existing conditions | What is known, what needs assessment and how concealed damage is handled. |
| Responsibilities | Who handles design, materials, protection, debris, licensed trades and required approvals. |
| Changes and completion | How price or schedule changes are approved and how final items are recorded. |
Share photos, approximate dimensions, existing fixture locations and what is not working. Identify leaks, previous repairs, accessibility needs and features you want to retain.
Confirm included work, providers, product choices or allowances, responsibilities and access. Agree how discoveries or requested changes will be documented, priced and approved before extra work proceeds.
Confirm materials and the proposed sequence before demolition. Coordinate preparation, specialist work, any required inspections, finishes and the household's access needs. Review concealed conditions before covering the work.
Walk through the agreed fixtures and finishes, record remaining adjustments and retain product-care information. Confirm any outstanding trade or inspection items and project-specific return-to-use instructions.
A construction schedule should distinguish preparation and ordering from time spent working in your bathroom. Share your preferred timing, but plan around a confirmed scope and agreed schedule rather than a generic remodel duration.
Yes. Discuss a shower, tub, vanity or finish update separately from a full room renovation. Identify what must remain and how the new work meets it. Existing conditions and specialist connections still need review before the boundaries and price are agreed.
Keeping suitable fixture locations can change the scope compared with a layout redesign. Share that preference early. The chosen fixtures, existing connections, preparation and ventilation still need assessment; retaining the layout does not establish that no trade or approval work is needed.
Yes. Bring the existing tub dimensions and your shower preferences. The review should address drainage, access, the selected shower assembly, waterproofing and adjoining finishes. Confirm the actual conversion scope and responsible providers before selecting products or assuming an installation date.
Ask which preparation and water-management assembly is specified for the shower or wet area, who installs it and how relevant checks are documented before tile covers it. Attractive tile and grout do not describe those underlying details. Repairs to existing leaks or damaged materials should be identified separately.
Yes. Explain the user's access and bathing needs alongside the room dimensions, desired fixtures and available space. Discuss the features and layout that fit those needs. Any required specialist design or compliance review must be identified for the actual project rather than assumed from an accessible product label.
Tell Numark before planning the work. Identify when the toilet, shower or whole room would be unavailable and agree a practical household access plan. The proposal and sequence need to reflect that limitation; uninterrupted bathroom use should not be assumed during a full renovation.
Discuss proposed customer-supplied products before ordering. Confirm dimensions, compatibility, quantities, delivery, storage, damaged-item handling and installation responsibilities. Record what is included in the estimate and what happens if a product is late, unsuitable or missing a required component.
Start with the included tasks and specific products or clearly stated allowances. Ask how unused or exceeded allowances and concealed-condition discoveries affect pricing. Requested additions or changed conditions should have documented scope, price and schedule approval before extra work proceeds. A virtual estimate is not a confirmed construction price or start date.
A few photos, approximate dimensions and your priorities make a useful first conversation. Measurements and site conditions are confirmed for the proposed work.
Sketch your bathroom layout with Rooms & SketchesFree
Request a time$250
Written scope of work with itemized pricing, coordination of our crew and licensed trades, and your project in the Client Portal.
Pay for written estimate$250 / hour
Pay for consultation$0.14 / sq ft · $350 minimum · No price cap
Assessment & estimate total
—
Any property size
Estimate and consultation fees are separate from the cost of construction work.
After you request or pay, Numark reviews your project and confirms a visit time with you; payment alone does not book an appointment.
Wayne, Oakland and Macomb counties and surrounding Southeast Michigan communities, approximately 50 miles from Detroit. Confirm availability for your exact property address and project scope.